Cumbria Green Build Festival

12 - 27 Sep 2015

Drop In: Passivhaus In Progress - high levels of insulation & MVHR

Energy-saving improvements

  • 'Big' insulation works
    'Big' insulation works
  • Sustainable building materials
    Sustainable building materials

Location

Foxfield Road
Broughton-in-furness
Cumbria
LA20 6EZ

View on map

Opening times

12 - 27 Sep 2015
Saturday, 12th September
Drop in from 10 - 4.
For more details and events see www.cafs.org.uk/events

This event has now finished.

Just turn up For more details and events see www.cafs.org.uk/events

 Drop in and talk to the owners of this new house being built to passive house standards. The house was designed by the owners who are also project managing the construction. There is no central heating; the house has high levels of insulation and is heated mainly by solar gain, a mechanical heat recovery ventilation system and a 2 kW gas fire for extra heat when needed. 

Location

Foxfield Road
Broughton-in-furness
Cumbria
LA20 6EZ

View on map

Opening times

12 - 27 Sep 2015
Saturday, 12th September
Drop in from 10 - 4.
For more details and events see www.cafs.org.uk/events

This event has now finished.

Just turn up For more details and events see www.cafs.org.uk/events

Other homes nearby

Part of the Green Open Homes network